Dr. Gridlock columns  |  Weekly Q&A  |  Add Dr. Gridlock:    Twitter  |    RSS  |  phoneLocal/Commuter Alerts

VDOT Working on Beltway Ramp

To ease congestion, the Virginia Department of Transportation is adding another lane to the ramp from Route 7 in Falls Church onto the inner loop of the Capital Beltway.

This involves reconfiguring the westbound lanes of Route 7 at the intersection with Magarity Road in Falls Church.

The work is scheduled to be done on Nov. 20. In the meantime, watch for occasional lane closings through the area during off-peak hours.The $429,992 project also involves construction of a sidewalk, curb, gutter and pedestrian fence for safety.

The Metrobus stop for routes 28A, B and T at the intersection is temporarily unavailable. The nearest stop is to the east, across from Marshall High School.

By Robert Thomson  |  September 3, 2008; 9:43 AM ET
Categories:  Advisories , Commuting , Congestion , Construction Share This:  E-Mail | Technorati | Del.icio.us | Digg | Stumble Previous: Montgomery Planning Pedestrian Improvements
Next: Bay Bridge Update

No comments have been posted to this entry.

The comments to this entry are closed.

 
 
RSS Feed
Subscribe to The Post

© 2009 The Washington Post Company